Revision as of 02:49, 3 June 2008 (edit) Thebruce (Talk | contribs) m ← Previous diff |
Current revision (06:11, 6 June 2008) (edit) (undo) Thebruce (Talk | contribs) m |
(2 intermediate revisions not shown.) |
Line 7: |
Line 7: |
| | | |
| |- valign="top" align="center" | | |- valign="top" align="center" |
- | |<!--youtube>5uOUkIiuZCY</youtube--> | + | |<youtube>tGkYxKcGCEU</youtube> |
| |align="left" width="100%"|<blockquote> | | |align="left" width="100%"|<blockquote> |
| TROG EVAL - Subspan Gearway - approach SE. Recent energy detected, blowback present. SV-CATA surveillance initiated. S.E.T. CLASS 1. | | TROG EVAL - Subspan Gearway - approach SE. Recent energy detected, blowback present. SV-CATA surveillance initiated. S.E.T. CLASS 1. |
Line 15: |
Line 15: |
| | | |
| |- | | |- |
- | |align="center"|[http://panatrog.org/swf/panatrog_video4.flv FLV link] | + | |align="center"|[http://panatrog.org/swf/panatrog_video4.flv FLV link] / [http://www.youtube.com/watch?v=tGkYxKcGCEU Youtube link] |
| |} | | |} |
| </div> | | </div> |
Line 23: |
Line 23: |
| '''''Transcription''''' | | '''''Transcription''''' |
| <blockquote> | | <blockquote> |
- | :<br> | |
| :PANATROG S.P.O.T. Patrol. | | :PANATROG S.P.O.T. Patrol. |
| :Definite markings of a geared gateway. | | :Definite markings of a geared gateway. |
| :Looks like we've got a 3 inch blockage, which would be an OET-- no, sorry, that's a 6 inch SET. T-7 gear configuration. | | :Looks like we've got a 3 inch blockage, which would be an OET-- no, sorry, that's a 6 inch SET. T-7 gear configuration. |
- | :Some blow-back here. Definite active [[gearay|gateway]]. | + | :Some blow-back here. Definite active [[gearway|gateway]]. |
| :We need to set up surveillance. | | :We need to set up surveillance. |
| :Let's get a reference check on this. | | :Let's get a reference check on this. |