(Difference between revisions)
Revision as of 05:05, 6 June 2008 (edit)
Thebruce (Talk | contribs)
m
← Previous diff
Current revision (06:11, 6 June 2008) (edit) (undo)
Thebruce (Talk | contribs)
m
 
Line 26: Line 26:
:Definite markings of a geared gateway. :Definite markings of a geared gateway.
:Looks like we've got a 3 inch blockage, which would be an OET-- no, sorry, that's a 6 inch SET. T-7 gear configuration. :Looks like we've got a 3 inch blockage, which would be an OET-- no, sorry, that's a 6 inch SET. T-7 gear configuration.
-:Some blow-back here. Definite active [[gearay|gateway]].+:Some blow-back here. Definite active [[gearway|gateway]].
:We need to set up surveillance. :We need to set up surveillance.
:Let's get a reference check on this. :Let's get a reference check on this.

Current revision


Subspan Gearway
By PANATROG (May 12)

TROG EVAL - Subspan Gearway - approach SE. Recent energy detected, blowback present. SV-CATA surveillance initiated. S.E.T. CLASS 1.

STATUS: ACTIVE - SOURCE: TROG SPECIALIST A841

FLV link / Youtube link


Transcription

PANATROG S.P.O.T. Patrol.
Definite markings of a geared gateway.
Looks like we've got a 3 inch blockage, which would be an OET-- no, sorry, that's a 6 inch SET. T-7 gear configuration.
Some blow-back here. Definite active gateway.
We need to set up surveillance.
Let's get a reference check on this.

Screencaps