(Difference between revisions)
Revision as of 05:05, 6 June 2008 (edit) Thebruce (Talk | contribs) m ← Previous diff |
Current revision (06:11, 6 June 2008) (edit) (undo) Thebruce (Talk | contribs) m |
Line 26: |
Line 26: |
| :Definite markings of a geared gateway. | | :Definite markings of a geared gateway. |
| :Looks like we've got a 3 inch blockage, which would be an OET-- no, sorry, that's a 6 inch SET. T-7 gear configuration. | | :Looks like we've got a 3 inch blockage, which would be an OET-- no, sorry, that's a 6 inch SET. T-7 gear configuration. |
- | :Some blow-back here. Definite active [[gearay|gateway]]. | + | :Some blow-back here. Definite active [[gearway|gateway]]. |
| :We need to set up surveillance. | | :We need to set up surveillance. |
| :Let's get a reference check on this. | | :Let's get a reference check on this. |
Current revision
Subspan Gearway
|
- By PANATROG (May 12)
|
|
TROG EVAL - Subspan Gearway - approach SE. Recent energy detected, blowback present. SV-CATA surveillance initiated. S.E.T. CLASS 1.
STATUS: ACTIVE - SOURCE: TROG SPECIALIST A841
|
FLV link / Youtube link
|
Transcription
- PANATROG S.P.O.T. Patrol.
- Definite markings of a geared gateway.
- Looks like we've got a 3 inch blockage, which would be an OET-- no, sorry, that's a 6 inch SET. T-7 gear configuration.
- Some blow-back here. Definite active gateway.
- We need to set up surveillance.
- Let's get a reference check on this.
Screencaps